Facility Client Development Stage Year Remark
Electric Desalter (ЭЛОУ) , Atmospheric and Vacuum Distillation Units (АВТ), and Bitumen-Production Units within Paraffin Solvent Production Unit (UPRP) JSC "LUKOIL-Kogalymneftegaz"
Kogalym
Detailed Design 1994 Commissioned in 1997
Revamping of the Atmospheric Distillation Column of Atmospheric and Vacuum Distillation Unit, 
JSC "BITRAN", Ukhta
RPE "PETON"
Orsk
Detailed Design 1996 Commissioned in 1996
Revamping of Crude Oil Stabilization Unit (USN -1500) CJSC "Stabilizatsia"
Nizhnevartovsk
Business Plan 1997
Revamping of Oil Stabilization Unit (USN 4-1) to increase its Feed Capacity to 2.0 million tpy 
LLC "Nizhnevartovsk RPE", Tyumen Oil Company
Volgograd Company "Neftezavodmontazh"
Volgograd
Detailed Design 1998 Commissioned in 1999
Revamping of the Atmospheric Distillation Unit in Astrakhan Gas Processing Plant JSC "Delta"
Austria
Technical and Economic Assessment 1998
Revamping of 2.0 million tpy Oil Stabilization Unit 
(USN 4-2) (ЭЛОУ-АТ) LLC "Nizhnevartovsk RPE", Tyumen Oil Company
Volgograd Company "Neftezavodmontazh"
Volgograd
Detailed Design 1999 Commissioned in 2000
Upgrading of Column Equipment with replacement of internals Orenburg Gas Processing Plant OJSC "Orenburggazprom" Technical Design 1999 Commissioned in 1999
Revamping of Gas Condensate Stabilization Unit 
(GS-2)
State-run enterprise "Turkmengaz"
Turkmenia
Technical and Commercial Proposal 1999
Revamping of Atmospheric and Vacuum Distillation Unit OJSC "LUKOIL-Odessa Refinery"
Odessa, Ukraine
Technical and Commercial Proposal 2000
Additional equipment of AT-1 Unit to increase its capacity to 3.2 million tpy OJSC "LUKOIL-Ukhtaneftepererabotka" OJSC "LUKOIL-Rostovneftekhimproekt"
Rostov-on-Don
Detailed Design 2000 Commissioned in 2001
Revamping of Electric Desalter, Atmospheric and Vacuum Distillation Unit to increase its capacity to 
2.1 million tpy OJSC "LUKOIL-Odessa Refinery"
OJSC "LUKOIL-Rostovneftekhimproekt"
Rostov-on-Don
Process Part of Detailed Design 2000 Commissioned in 2001
Yuzhno-Shapkinskoye Field Crude Oil Treatment Unit Petrofac LLC
Great Britain
Detailed Design Documentation 2002 Commissioned in 2004
Technical support in operation of Kogalym Refinery. Obtaining of Process Operating Regulations Approval for Paraffin Solvent Production Unit (ЭЛОУ-АВТ) CJSC "Kogalymneftegas" Technical Assistance 2003
Major turnaround of ЭЛОУ АВТ-2 Unit with capacity 
2.2 million tons/year
OJSC "Khersonnefte-pererabotka"
Kherson, Ukraine
Detailed Design 2004 Commissioned in 2004
Upgrading of ЭЛОУ-АВТ-6 Unit under Koh-Glitsch Basic Design at the Refinery OJSC "Angarsk Petrochemical Company" OJSC "Angarskneftechim-proekt"
Angarsk
Detailed Design Documentation 2006
Turn-key construction project of Crude Stabilization Unit USN-500 (500 000 tpy capacity) at oil and gas transshipment complex CJSC “Syntez-Oil” Technical Annexes to the Contract 2007
Revamping of shop No.3 column section and installation of reboilers LLC "Nizhnevartovsk RPC"
Nizhnevartovsk
Detailed Design 2007 FAU "RF Glavexpertiza" positive conclusion
Major turnaround and revamping of fuel oil Vacuum Distillation Unit No.1 (VT-1) at Turkmenbashi Refinery with increase in capacity up to 1.6 million tpy LLC "Elitstroy" Detailed Design 2007
Elaboration of BEDD for Electric Desalter for preparation of Russian oil refining and chemical engineering corrosion prevention system for cooler-condenser equipment of Atmospheric Distillation Columns of ELOU-AVT Unit with capacity 500 000 tpy, town of Volkhov LLC "Volkhovneftechim" Elaboration of BEDD 2007
Revamping of vacuum section of electric desalter АВТ (ЭЛОУ-АВТ) unit at
OJSC "Khabarovsk Oil Refinery"
OJSC "Khabarovsk Oil Refinery" Detailed Design Documentation 2012
Revamping of heat exchange circuit of ЭЛОУ-АВТ-2.5 unit at OJSC "Novoshakhtinsk Petroleum Product Plant" OJSC "Novoshakhtinsk Petroleum Product Plant" Detailed Design Documentation 2012
Revamping of electric desalter АВТ (ЭЛОУ-АВТ) unit at OJSC "Khabarovsk Oil Refinery" OJSC "Khabarovsk Oil Refinery" Detailed Design Documentation 2013
Facility Client Development Stage Year Remark
Revamping of the Л-24-8 Unit for
LLC "LUKOIL- Volgogradneftepererabotka"
R&D Center of Oil Company "LUKOIL"
Moscow
Feasibility Study 1996
1.0 million tpy Diesel Oil Hydrotreating Unit LLC "LUKOIL-Volgograd-
neftepererabotka"
Volgograd
Technical and Commercial Report 1996
Upgrading of ЛЧ-24-2000, ЛГ-24-7, Л-24-6 Units JSC "KINEF"
Kirishi, Leningrad Region
Technical and Commercial Proposal 1996
1.4 million tpy Diesel Hydrotreating Unit
(P -24-1400/1) for LLC "LUKOIL-Volgogradneftepererabotka"
JSC "LUKOIL-Rostovneftekhimproekt"
Rostov-on-Don
Detailed Design 1997 Commissioned in 2000
Licensor - UOP
Upgrading of Stabilization Section in
ЛЧ -24-2000 Unit
JSC "Moscow Refinery"
Moscow
Technical and Commercial Proposal 1997
Addition of Gas/Air Catalyst Regeneration Section to Л-24-6 Unit OJSC "Cracking"
Saratov, OC "Sidanko"
Detailed Design 1998 Commissioned in 1998
Upgrading of Hydrogen Concentration Section of ЛЧ-24-2000 Diesel Oil Hydrotreating Unit OJSC "Moscow Refinery"
Moscow
Detailed Design Documentation 1999 Commissioned in 2000
Upgrading of Л-24-6 Unit OJSC "Saratov Refinery"
Saratov, OC "Sidanko"
Justification of Investments 2001
Revamping of Л-24-5 Hydrotreating Unit with replacement of reactors and heaters OJSC "Moscow Refinery"
Moscow
Detailed Design Documentation 2001 Revamped in 2002
Increase in Hydrotreatment Capacity of Saratov Refinery to 2,000,000 tpy (3 versions) OJSC "Saratov Refinery"
Saratov, OC "Sidanko"
Technical and Commercial Proposal 2002
Hydroprocessing Complex for
OJSC "Khabarovsk Refinery"
OC "Alliance" Specifications for Design Development for LG&EC, South Korea 2004
Revamping of KGO Unit. Kerosene Cut Hydrotreating Section at OJSC "LUKOIL-Odessa Refinery" JSC "LUKOIL-Rostovneftekhimproekt"
Rostov-on-Don
Detailed Design Documentation 2006 Revamped in 2009
Constructiion of Wax Hydtrotreating Section of 40/3 Deoiling Unit at OJSC "LUKOIL-Nizhegorodnefteorgsyntez" OJSC "LUKOIL-Nizhegorod-
nefteorgsyntez"
Nizhniy Novgorod
Detailed Design 2007 FAU “RF Glavgosexpertisa”’s favourable conclusion. Commissioned in 2010. Licensor – LLC "Katachim", Moscow
Hydrotreating Reactor of Unit ЛЧ-24-2000 at
OJSC "Nizhegorodnefteorgsyntez"
OJSC "LUKOIL-Nizhegorod-
nefteorgsyntez"
Nizhniy Novgorod
Technical Design 2007
Revamping of Unit ЛЧ-24-2000 aiming to change to production of diesel oil with sulfur content 10 ррm at OJSC "LUKOIL - Nizhegorodnefteorgsyntez" OJSC "LUKOIL-Nizhegorod-
nefteorgsyntez"
Nizhniy Novgorod
Design Documentation Detailed Design Documentation 2008 FAU “RF Glavgosexpertisa”’s favourable conclusion Commissioned in 2010. Licensor – UOP

Revamping of Diesel-Oil Hydrotreatment Unit Л-24/7 at OJSC “Kuibyshev Refinery”

OJSC "Samaraneftekhimproect" Samara

Design Documentation Detailed Design Documentation 2010 FAU "RF Glavgosexpertisa"’s favourable conclusion
Diesel-oil Hydrotreating Unit at LLC "Afipsky Refinery" LLC "Afipsky Refinery" Follow-up of Basic Design Acceptance 2012 Licensor – Haldor Topsoe
Combined Diesel Oil Hydrotreatment Unit and Hydrogen Production Unit PGV-2000 at
LLC "Afipsk Refinery"
LLC "Afipsk Refinery" Design Documentation 2013
Updating of the working documentation with the view of separate start and operation of Hydrotreatment Section of the Combined Vacuum Gas Oil Hyrocracking, and Diesel Oil and Kerosene Hydrotreatment Unit (GKGO-500/1000) at
OJSC “Khabarovsk Oil Refinery”

OJSC "Khabarovsk Oil Refinery" OC ALLIANCE

Detailed Design Documentation 2013
Revamping of Hydrotreatment Section at Catalytic Reforming Unit at OJSC "Khabarovsk Oil Refinery" JSC "NNK-Khabarovsk Oil Refinery" Design Documentation Detailed Design Documentation 2014 Approved by Federal Independent Institution "Glavgosexpertiza of Russia"
Modernization of motor oil production in order to provide Euro 4 and 5 quality at Astrakhan Gas Processing Plant. Diesel Oil Hydrotreatment Unit У-1.732 LLC "NIPI NG "Peton"
Ufa
Detailed Design Documentation 2014
Revamping of VGO Hydrotreatment Unit of workshop No. 9 at OJSC "Gazprom neftekhim Salavat" OJSC "Gazprom neftekhim Salavat" Development of initial data 2015
Diesel Oil Hydrotreatment Unit at LLC Afipsk Refinery with capacity 3,3 mln tpy (of feed) LLC "Afipsk Refinery" 2018 Licensor – Haldor Topsoe
Facility Client Development Stage Year Remark
850,000 tpy Diesel Oil Hydrodewaxing Unit (GDS-850) of OJSC "LUKOIL-Ukhtaneftepererabotka" OJSC "LUKOIL-Rostovneftekhimproekt"
Rostov-on-Don
Detailed Design 2001 Commissioned in 2003 Licensor – Süd-Chemie
Elaboration of detailed design documentation on revamping of reactor section of unit GDS-850 aiming to produce diesel oil with sulfur content 10 ppm and capacity increase to 1.1 million tpy at OJSC "LUKOIL-Ukhtaneftepererabotka" OJSC "LUKOIL- Nizhegorodniinefteproekt" Nizhniy Novgorod Detailed Design Documentation 2011 FAU “RF Glavgosexpertisa”’s favourable conclusion Licensor – Süd-Chemie
Hydroisodewaxing unit of hydrocracked residue with production of group II and III base oils at LLC “Gazpromneft-SM” – “Omsk lubes production plant” LLC “Gazpromneft-SM” - “OZSM” Follow-up and Acceptance of Basic Design 2014
Hydroisodewaxing unit of hydrocracked residue with production of group II and III base oils at LLC "Gazpromneft-SM" – "Omsk lubes production plant" LLC "Gazpromneft-SM" - "OZSM" Design Documentation Detailed Design Documentation 2016 Licensor – ExxonMobil
Facility Client Development Stage Year Remark
Upgrading of Л-24/8С Unit for vacuum gas oil light hydrocracking process OJSC "Syzran Refinery" Syzran, OC YUKOS Technical and Commercial Proposal 1999
Upgrading of Л-24/6 Unit for light vacuum gas oil hydrocracking process OJSC "Kuibyshev Refinery" Samara, OC YUKOS Technical and Commercial Proposal 1999
Upgrading of Syzran Refinery Л-24/8С Unit
OJSC "Syzran Refinery" for the light vacuum gas oil hydrocracking process
Volgogard Company "Neftezavodmontazh"
Volgograd
Detailed Design 2000 Commissioned in 2001 Licensor – Criterion
Vacuum Gas Oil Hydrocracking Unit within Hydroprocessing Complex at Khabarovsk Refinery

Alliance Group
OC Alliance

Feasibility Study (studiya proekt) 2004
Upgrading of Л-24/8С Unit at OJSC "Syzran Refinery" with increasing capacity to
850 000 t/y
OJSC "Syzran Refinery" Syzran, OC Rosneft Detailed Design Documentation 2010 Commissioned in 2011 Licensor – Criterion
Facility Client Development Stage Year Remark

Reconstruction of C-100 at КТ-1/1 Complex

OJSC "Gazpromneft - Omsk Refinery”  Justification of Investments 2012

Combined Unit G-43/107 at OJSC “Gazpromneft - Moscow Refinery”

OJSC “Gazpromneft - Moscow Refinery” Follow-up and Acceptance of Basic Design 2014
Revamping of Combined Catalytic Cracking Unit
G-43-107 at OJSC  “Gazpromneft - Moscow Refinery”
OJSC “Gazpromneft - Moscow Refinery” Design Documentation Detailed Design Documentation 2014 FAU "RF Glavgosexpertisa"’s favourable conclusion
Licensor – Axens
Facility Client Development Stage Year Remark
1,000,000 tpy Gasoline Cut Mixture Catalytic Reforming Unit Turkmenbashi Refinery
Turkmenbashi, Turkmenia
Technical and Commercial Proposal 1996
Revamping of Л-35-11/300 Unit to increase its capacity to 450,000 tons/year OJSC "Moscow Refinery"
Moscow
Technical and Commercial Proposal 1996
Addition of Pre-contactor and Revamping of Heater Section at Л-35-11/300 Unit Tuapse Refinery
Tuapse, OC Rosneft
Check Calculations and Detailed Design Documentation 1996 Revamped in 1998
Revamping of Reactor and Heater section of Л-35-11/300 Unit OJSC "Moscow Refinery"
Moscow
Detailed Design Documentation 1996 Commissioned in 1997
Licensor – UOP
Replacement of Л-35-11/300 NHT Reactor OJSC "Moscow Refinery"
Moscow
Detailed Design Documentation 1996 Mounted in 1997
Revamping of ЛЧ-35-11/1000 Catalytic Reforming Unit for Seidinsk Refinery (Chardzhou) GRIMMA Company
FRG
Technical and Commercial Proposal 1997
Revamping of Л-35-11/300 Unit to increase its capacity to 400,000 tpy Tuapse Refinery
Tuapse, OC Rosneft
Technical and Commercial Proposal 1997
Gas Recovery Section of Reforming Unit with capacity of 20,000 tpy TPP "LUKOIL-Uraineftegaz"
Urai
Detailed Design 1997 Commissioned in 1998
Regeneration Gas Treatment Section in
Л -35-11/300 Unit
Tuapse Refinery
Tuapse, OC Rosneft
Detailed Design Documentation 1998 Сommissioned in 1998
Replacement of Reactor Effluent Separator of NHT Section in Л-35- 11/300 Unit LLC "KINEF"
Kirishi, Leningrad Region
Technical and Commercial Proposal 1998
Replacement of Separator in Л-35-11/300 Unit LLC "KINEF"
Kirishi, Leningrad Region
Detailed Design 1999 Mounted in 1999
Upgrading of ЛЧ-35-11/600 Unit LLC "KINEF"
Kirishi, Leningrad Region
Technical and Commercial Proposal 1999
500,000 tpy Catalytic Reforming Unit with NHT Section OJSC "Komsomolsk Refinery"
Komsomolsk-on-Amur,
OC Rosneft
Justification of Investments 1999
Control system upgrading of ЛЧ–35-11/1000 Unit LLC "KINEF"
Kirishi, Leningrad Region
Technical and Commercial Proposal 1999
Revamping of Л-35-8/З00B Aromatic Hydrocarbons Unit for LLC "LUKOIL-Volgogradneftepererabotka" UOP
Great Britain
Feasibility Study 1999
Revamping of CR-1 Catalytic Reforming Unit, AD "LUKOIL-Neftochim", Bourgas, Bulgaria OJSC "LUKOIL-Rostovneftekhimproekt"
Rostov-on-Don
Process Part of Business Plan 2000
Revamping of Л-35-8/300-B Unit to increase benzene yield LLC "LUKOIL-Permnefteorgsyntez"
Perm
Feasibility Study 2000
1,000,000 tpy Catalytic Reforming Unit with Afterfractionating Section (PR- 22-35-11/1000) for "LUKOIL-Volgogradneftepererabotka" OJSC "LUKOIL-Rostovneftekhimproekt"
Rostov-on-Don
Detailed Design 2000 Commissioned in 2006
Licensor– UOP
Upgrading of Л-35-11/300 Unit OJSC "Saratov Refinery"
Saratov, OC Sidanko
Justification of Investments 2001
Revamping of ЛГ-35-11/300 Catalytic Reforming Unit OJSC "LUKOIL-Odessa Refinery"
Odessa, Ukraine
Process Calculations and Assignment for supply of PACKINOX Heat-Exchanger 2001
Revamping of ЛГ-35-11/300 Catalytic Reforming Unit at OJSC "LUKOIL-Ukhtaneftepererabotka" UOP
Great Britain
Feasibility Study 2001
Upgrading of ЛГ-35-11/300 Catalytic Reforming Unit to increase its capacity to 380,000 tpy at OJSC "LUKOIL-Ukhtaneftepererabotka" OJSC "LUKOIL-Rostovneftekhimproekt"
Rostov-on-Don
Detailed Design 2002 Commissioned in 2004
Licensor – UOP
Hydrotreating Sections of Catalytic Reforming Units OJSC "Syzran Refinery"
Syzran, OC Rosneft
Recommendations regarding equipment protection against corrosion and salt formation 2002
Hydrogen-Rich Gas Drying Section and Hydrotreating and Reforming Catalyst Regeneration Section of VR-650 Unit LLC "LUKOIL-Western Siberia"
Uraineftegaz Refinery
Detailed Design Documentation 2002 Mounted in 2003
Protection of Catalytic Reforming Equipment against Organic Chloride Corrosion OJSC "Syzran Refinery"
Syzran, OC Rosneft
Design 2002 Mounted in 2003
Revamping of Л-35-8/300Б Unit to increase its capacity to 400,000 tpy LLC "LUKOIL-Volgogradneftepererabotka"
Volgograd
Detailed Design 2002 Commissioned in 2003
Licensor – UOP
Upgrading of Unit ЛГ-35-11/600. Calculation of sulfur trap pipe system OJSC "Khersonnefte-pererabotka"
Kherson, Ukraine
Calculations and detailed design documentation 2002 Commissioned in 2003
Licensor – VNIINeftechim,
St. Petersburg
Installation of feed heat- exchanger of PAKINOX type in Reforming Section of ЛГ-35-11/300-95 Unit OJSC "LUKOIL-Odessa Refinery"
Odessa, Ukraine
Detailed Design Documentation 2003 Installation completed in February 2004
Upgrading of Unit Л-35-11/600. Recommendations on operation of heaters P-201 and P-202 for capacity Qmin =250 000 tons/year and Qmax=350 000 tons/year OJSC "Kherson-neftepererabotka"
Kherson, Ukraine
Recommendations 2003
Upgrading of Unit Л-35-11/600. Recommendations on operation of Unit Л-35-11/600 at pressure 18 kgf/cm2 (gage) in the last reactor of Catalytic Reforming section for capacity Qmin =250 000 tons/year and Qmax=350 000 tons/year OJSC "Kherson-neftepererabotka"
Kherson, Ukraine
Recommendations 2003
Upgrading of Unit ЛГ-35-11/300-95 to increase capacity to 450,000 tons/year (based on feed flow rate) OJSC "Khabarovsk Refinery"
OC Alliance
Basic Design (using Criterion catalyst) 2003 Licensor – Criterion
Automated process control system of Units ЛГ-35-UVPB for LUKOIL-Odessa Refinery OJSC "LUKOIL-Odessa Refinery"
Odessa, Ukraine
Detailed Design 2004 Mounted in 2005
Upgrading of section 200 "Catalytic Reforming" of Unit ЛK-6U and construction of "Recontact" Section LLC "PetroKazakhstan Oil Products"
Shymkent, Republic of Kazakhstan
Detailed Design Documentation 2004 Detailed Design Documentation on the 1st stage was handed over to the Refinery. Financing was suspended
Licensor – UOP
Installation and piping of the reciprocating compressor for Unit ЛГ-35-11/300 at
OJSC "LUKOIL-Odessa Refinery"
OJSC "LUKOIL-Odessa Refinery"
Odessa, Ukraine
Detailed Design Documentation 2007
Revamping of Unit ЛЧ-35/11-600 aiming to reduce pressure and construction of benzene cut separation unit at OJSC "Syzran Refinery" OJSC "Syzran Refinery"
Syzran, OC Rosneft
Detailed Design 2007 FAU "RF Glavexpertiza" positive conclusion.
Commissioned in 2011.
Licensor – Axens
Revamping of Catalytic Reformer Unit ЛГ-35-11/300 to increase capacity from 300000 to 450 000 t/y at OJSC "Khabarovsk Refinery" OJSC "Khabarovsk Refinery"
OC Alliance
Detailed Design Documentation 2007 1st phase – uniy was brought to capacity 350 000 t/y in 3rd quarter 2010
Licensor – Criterion
748 000 t/y catalytic reforming unit with continuous catalyst regeneration OJSC "NPK-Galychina"
Ukraine
Design Documentation Detailed Design Documentation 2008 Part of the documentation was developed. Finance suspended
Piping of CRU plate heat exchanger in refinery complex ЛК-6У in LLC "PetroKazakhstan Oil Products" LLC "PetroKazakhstan Oil Products"
Shymkent, Republic of Kazakhstan
Detailed Design Documentation 2010 Mounted in February 2011

Revamping of Unit Л-35/11-1000 at Kuibyshev Refinery aimed to operate at reduced pressure in reformer section

OJSC "Samaraneftekhimproect"
Samara
Design Documentation Detailed Design Documentation 2010 FAU “RF Glavgosexpertisa”s favourable conclusion
Revamping of heater section of unit ЛГ-35-11/300-95 at LLC "LUKOIL-Ukhtaneftepererabotka" LLC "LUKOIL-Nizhegorodniinefteproject"
Nizhniy Novgorod
Detailed Design Documentation 2012 Commissioned in 2012
Revamping of Hydrotreatment Section at Catalytic Reforming Unit at OJSC "Khabarovsk Oil Refinery" OJSC "Khabarovsk Oil Refinery" Design Documentation Detailed Design Documentation 2014
Modernization of motor oil production in order to provide Euro 4 and 5 quality at Astrakhan Gas Processing Plant. Diesel Oil consisting of:
- Catalytic Reforming Unit У-1.734;
- Benzol Cut Recovery Block
LLC "NIPI NG "Peton"
Ufa
Detailed Design Documentation 2014
Facility Client Development Stage Year Remark
Unit for Removing Hydrogen Sulfide from Off-Gases of the VNIINP-714 Additive Production Unit at Yaroslavl Refinery named after Mendeleev JSC "Oils and Additives Producers"
Moscow
Detailed Design 1993 Construction suspended in 1995 due to lack of finance
Upgrading of Synthesis Gas Potash Treatment Unit JSC "Akron"
Novgorod
Technical and Commercial Proposal, and Detailed Design 1996 Completed in 1998
Facility Client Development Stage Year Remark
Provision of Services for Ordering Equipment for PI-200 Isomerization Unit and Work Coordination on Use of Existing Parex-2M Unit Equipment in PI-200 Unit JSC "Permnefteorgsyntez"
Perm
JSC "Lengiproneftekhim"
St. Petersburg
Procurement 1993
PI-200 Unit. Hydrotreating Reactor JSC "LUKOIL-Permnefteorgsyntez"
Perm
Detailed Design 1994
PI-200 Unit. Stack. Unit Heaters. Process part of the Process Operating Regulations for Hydrotreating Section Design JSC "LUKOIL-Permnefteorgsyntez"
Perm
Detailed Design 1996
Addition of 213,000 tpy Isomerization Unit to Л-35-11/300 Unit OJSC "Moscow Refinery"
JSC "Korimos"
Moscow
Detailed Design 2000
Addition of 170,000 tpy С5/С6 Isomerization Unit to Catalytic Reforming Unit Petrotel-LUKOIL Refinery
Romania
Detailed Design 2000 Commissioned in 2001
Licensor – UOP
Isomerization and Oligomerization Units "LINOS" Company Feasibility Study 2002
120,000 tons/year Isomerization Unit PI-DIH/120 OJSC "LUKOIL-Odessa Refinery"
Odessa, Ukraine
Detailed Design 2003 Commissioned in August 2004
Licensor – UOP
50,000 tpy n-butane Isomerization Unit AD "LUKOIL Neftochim Bourgas"
Bulgaria
Detailed Design Documentation 2004 Commissioned in 2008
Licensor – Axens
IBP-85°С Cut Isomerization Unit with Feed-preparation and Deisopentanization sections of capacity 80.000 tons/year OJSC "Khersonnefte-pererabotka"
Kherson, Ukraine
Detailed Design 2004 Approvals package was. submitted for approval in 2006. Finance suspended.
Isomerization Unit with DHT, Hydrogenation and Deisogexanation PGI-DIH/280,
OJSC "Syzran Refinery"
OJSC "Syzran Refinery"
Syzran, OC Rosneft
Detailed Design 2006 FAU "RF Glavexpertiza" positive conclusion.
Commissioned in 2011.
Licensor – Axens
Isomerization Unit with NHT, Hydrogenation and Deisohexanization sections PGI-DIH/280-K at Kuibyshev Refinery OJSC "Samara-
neftekhimproekt"
Samara
Design and Detailed Design Documentation 2009 FAU "RF Glavexpertiza" positive conclusion.
Commissioned in September 2014
Licensor – Axens 
С5-С6 Cut Isomerization Unit at
OJSC “Novokuibysevsk Refinery”
OJSC "Samara-
neftekhimproekt"
Samara
Technical assistance during Basic Design Acceptance 2009 Licensor – Axens
Low-temperature Isomerization Complex with NHT, Hydrogenation and Deisohexanization sections PGI-DIH/280-NK at
OJSC "Novokuibyshevsk Refinery"
OJSC "Samara-
neftekhimproect"
Samara
Design and Detailed Design Documentation 2010 FAU “RF Glavgosexpertisa” favourable conclusion Commissioned in February 2015 Licensor – Axens
Pentane-Hexane Cut Isomerasation Unit ПГИ-434 at
OJSC "Gaspromneftechim Salavat"
OJSC "Salavatneftekhim-
remstroy"
Salavat
Design and Detailed Design Documentation 2012 FAU “RF Glavgosexpertisa” favourable conclusion Commissioned in 2017 Licensor – Axens
Facility Client Development Stage Year Remark
Conversion of Л-35-5 Unit for Isoselectoforming Process JSC "Ufaneftekhim"
Ufa, Bashkiria
Technical and Commercial Proposal 1997
Conversion of Л-35-11/300 Unit (OJSC "Kuibyshev Refinery") to Isoselectoforming Process NPP "Petrotech"
St. Petersburg
Check Calculations of Equipment and Detailed Design Documentation 1999 Converted in 1999
Facility Client Development Stage Year Remark
Engineering services for construction of H2S Recovery Unit at OJSC "Khabarovsk Oil Refinery" Tecnimont KT Italy Detailed Design Documentation 2011 Commissioned in May 2016
Facility Client Development Stage Year Remark
Hydrogen Recovery Unit at LCC "Afipsky Refinery" LLC "Afipsky Refinery" Follow-up of Basic Design Acceptance 2012 Licensor – Haldor Topsoe
Facility Client Development Stage Year Remark
10,000 to 15,000 tpy Marketable Oil Production Section CJSC "Dalneft"
Komsomolsk-on-Amur
Basic Design 1993
10,000 to 15,000 tpy Marketable Oil Production Section JSC "LUKOIL-Service"
Moscow
Standard Design 1993
Marketable Oil Production Section JSC "Atyrau Refinery"
Atyrau
Technical Proposal 1997
Facility Client Development Stage Year Remark
Combined 70-360°С Wide Distillate Cut Hydrotreating and Catalytic Reforming Unit JSC "LUKOIL-Kogalymneftegaz"
Kogalym
Basic Design 1993
Combined Catalytic Reforming and Isomerization Unit for North Africa region "Grimma" Company
Germany
Technical and Commercial Proposal 1999
Combined 70-360°С Long distillate Hydrotreating Unit and Catalytic Reforming JSC "LUKOIL-Western Siberia" Refinery within "Kogalymneftegaz"  Company, Kogalym Detailed Design Documentation 2002 Commissioned in March 2005
Combined 70-360°С Long Distillate Hydrotreating and Catalytic Reforming Unit JSC "LUKOIL-Western Siberia" Refinery within "Kogalymneftegaz" Company, Kogalym Process Operating Regulations 2004
Construction of Hydroprocessing Complex at Khabarovsk Oil Refinery consisting of:
- 500,000 tpy Diesel Oil and Kerosene Hydrotreatment Unit
- 1,200,000 tpy Vacuum Gas Oil Hydrocracking Unit
- Combined Amine Regeneration, SWS and Sulphur Production Unit with 13,000 tpy capacity (granulated sulfur)
 - 20,000 tpy Hydrogen Production Unit
Alliance Group Feasibility Study (studiya proekt) 2004 Hydrogen Production Unit сommissioned in July 2014 Vacuum Gas Oil Hydrocracking Unit сommissioned in July 2015
Combined Motor Fuel Production Unit at LANAZ Bitumen & Oil Refinery (Erbil, Republic of Iraq) OZEL ELEKTROLITIK BAKIR MAM. SAN. VE DIS TIC. A.S Feasibility Study 2018
Facility Client Development Stage Year Remark
Reforming Platinum Catalysts Production OJSC "OLCAT"
St. Petersburg
Process Part of Detailed Design 1994
Facility Client Development Stage Year Remark
ZMТ-250 Motor Fuel Refinery JSC "Lukoil-Kogalymneftegaz"
Kogalym
Construction Feasibility Study 1994
ZMТ -200 Motor Fuel Refinery ЧМЗ Production Corp.
Glazov, Udmurtia
Construction Feasibility Study 1996
1,500,000 tpy Refinery JSC "LUKOIL-Arktik-Tanker"
Murmansk
Construction Feasibility Study 1997
ZMТ-500 Motor Fuel Refinery in Kopeisk OJSC "Oil-Service"
Chelyabinsk
Construction Feasibility Study 1997
500,000 tpy Motor Fuel Plant in Bolshoy Kamen CJSC "Far East Oil Company" Construction Feasibility Study Report 1997
Upgrading of Samotlor Refinery Tyumen Oil Company
LLC "Nizhevartovsk Research and Production Corp."
Nizhevartovsk
Check Calculations of Equipment for Upgrading Project 1999
Upgrading of fuel production part at "Petrotel-LUKOIL" Refinery LUKOIL-Romania
Bucharest, Romania
Business Plan 1999
Upgrading of Ukhta Refinery JSC "LUKOIL-Rostovneftekhimproekt"
Rostov-on-Don
Development of Business Plan Process Part 2000
Construction of 3 million tpy Primorsky Refinery, Leningrad Region OJSC "Mariisky Machine-Building Plant" Preparation of Declaration of Intent for construction investment 2001
Rebuilding of Astrakhan gas processing plant in terms of design development of control system connection Astrakhan gas processing plant
Astrakhan, OJSC "Gasprom"
Detailed Design Documentation 2003 Commissioned in 2004
Motor fuel refinery,.construction stage II LLC "LUKOIL-West Siberia"
Refinery within
LLC "Kogalymneftegaz"
Kogalym
Updating of Feasibility Study 2003
Elaboration of proposals on development of crude oil refinery (1.8 mln and 2.5 mln tons/year of crude oil) OJSC "Khersonnefte-pererabotka"
OC Alliance, Ukraine
Proposals 2003
Declaration of Intent on investment in construction of oil refinery in Vyborg area of Leningrad Region CJSC "VNP"
Vyborg
Declaration of Intent 2003
Declaration of Intent on Investment in Construction of Advanced Processing Complex at OJSC "Khabarovsk Refinery" OJSC "Alliance Group" Declaration of Intent 2004
Feasibility Study (studiya "Proekt") for Construction of Hydroprocessing Complex at OJSC "Khabarovsk Refinery" OJSC "Alliance Group" Feasibility Study (studiya “PROEKT”) 2004
Declaration of Intent on Construction of 1,000,000 tons/year Oil and Gas Complex at Usinsk Region of Komi Republic LLC "Usinsk Refinery"
Usinsk
Declaration of Intent 2006
BEDD preparation for design of 2 million tpy Ulan-Bator Refinery "Vostokneftegas" Company Feasibility Study 2006
Pre-engineering study, collection and preparation of basic data for construction of Tyumen Refinery with 3 million tpy capacity LL "Tekhneftinvest"
Tyumen
Pre-engineering study 2007
Pre-design preparation for construction of gas-condensate processing plant with capacity 600,000 tpy in Tikhvin LLC "AVRO" Pre-engineering study 2007
Phased transfer of Khabarovsk Refinery consumers to natural gas use OJSC "Khabarovsk Refinery"
OC Alliance
Technical and economic estimation 2007
Pre-engineering study and elaboration of technical and economic estimation for 2.5 million tpy refinery in Volkhov LLC "Volkhovneftekhim"
Volkhov
Pre-engineering Study Technical and Economic Estimation 2007
Updating of Feasibility Study (studiya "PROEKT") to split Hydroprocessing Complex construction in the process of revamping OJSC "Khabarovsk Refinery" into 4 phases OJSC "Khabarovsk Refinery"
OC Alliance
Feasibility Study (studiya “PROEKT”) 2008
Execution of General Designer functions at Chudovo Refinery LLC "AVRO" 2008
Reconstruction of LLC "Ilskiy Refinery" LLC "Ilskiy Refinery" Technical and Economic Calculation 2012
Facility Client Development Stage Year Remark
Off-Site Facilities of ZMT-250 Motor Fuel Refinery JSC "LUKOIL-Kogalymneftegaz"
Kogalym
Detailed Design Documentation 1995 Commissioned in 1997
Unit for Treating Drip Oil and Oil Sludge Turkmenbashi Refinery
Turkmenbashi, Turkmenia
Technical and Commercial Proposal 1996
Recycling Water Supply Unit Turkmenbashi Refinery
Turkmenbashi, Turkmenia
Technical and Commercial Proposal 1997
Oil Products Metering Unit LLC "LUKOIL-Uraineftegaz"
Urai
Detailed Design Documentation 1997 Commissioned in 1998
Feedstock Supply Unit at the Catalytic Reforming Unit LLC "LUKOIL-Uraineftegaz"
Urai
Detailed Design Documentation 1997 Commissioned in 1998
Light Oil Products Loading Rack JSC "Korimos"
Moscow
Detailed Design 1998 Commissioned in 1999
Gas Distributing Point. Upgrading Stabilizatsia Company
Nizhevartovsk
Detailed Design 1998 Commissioned in 1999
Flare System. Upgrading OJSC "Cracking"
Saratov, OC Sidanko
Technical and Commercial Proposal 1999
Chemical Laboratory. Upgrading Volgograd Company "Neftezavodmontazh"
LLC "Nizhevartovsk NPO"
Nizhevartovsk, TNK-BP
Detailed Design 1999 Commissioned in 2000
Feedstock and Saleable Product Tank Farms with Pump Stations for pumping feedstock and oil products of USN 4-2 Unit Volgograd Company "Neftezavodmontazh"
LLC "Nizhevartovsk NPO"
Nizhevartovsk, TNK-BP
Detailed Design 1999 Commissioned in 2001
Hydrogen-Rich Gas Concentration Unit. Booster Compressor Station OJSC "LUKOIL-Permnefteorgsyntez"
Perm
Detailed Design 2000 Commissioned in 2002
Nitrogen and Oxygen Generation Station and Diesel Fuel PPD Addition Section (USN 4-2) LLC "Nizhevartovsk Oil Refining Corp." Detailed Design 2002
Off-site facilities of ZMT-250 Motor Fuel Refinery (storage facilities, additive injection section and air compressor station) JSC "LUKOIL-West Siberia"
Oil Refinery within LLC "Kogalymneftegaz"
Kogalym
Detailed Design Documentation 2003 Commissioned in March 2005
Upgrading of Heating Center No. 1, workshop No.14 for LLC "Kirishinefteorgsyntez" LLC "Proekt-Technology"
St. Petersburg
Detailed Design Documentation 2004 Commissioned in 2006
Construction of Central laboratory at
OJSC "Syzran Refinery"
OJSC "Syzran Refinery"
Syzran
Feasibility Study (studiya “PROEKT”) Detailed Design Documentation 2006 Commissioned in 2007
MTBE Production Complex at OJSC “Syzran Refinery”. Amenity building with distribution substation OJSC “Syzran Refinery”  
Syzran
Design Documentation Detailed Design Documentation 2011 FAU “RF Glavgosexpertisa” favourable conclusion 
Licensor - Axens
MTBE Production Complex at OJSC “Syzran Refinery”. Methanol storage and MTBE storage OJSC “Syzran Refinery”  
Syzran
Design Documentation Detailed Design Documentation 2011 FAU “RF Glavgosexpertisa” favourable conclusion 
Licensor - Axens
MTBE Production Complex at OJSC “Syzran Refinery”. Intermediate butane-butylene cut tank farm. Intermediate MTBE tank farm OJSC “Syzran Refinery”  
Syzran
Design Documentation Detailed Design Documentation 2011 FAU “RF Glavgosexpertisa” favourable conclusion 
Licensor - Axens
MTBE Production Complex at OJSC “Syzran Refinery”. Interconnecting piping lines OJSC “Syzran Refinery”  
Syzran
Design Documentation Detailed Design Documentation 2011 FAU “RF Glavgosexpertisa” favourable conclusion 
Licensor - Axens
Control room building with transformer substation, intermediate tank farm and interconnecting piping lines for connection of Pentane-Hexane Cut Isomerization Unit PGI-434 at OJSC “Gazprom neftekhim Salavat” OJSC “Salavatneftekhimremstroy” Design Documentation Detailed Design Documentation 2012 FAU “RF Glavgosexpertisa” favourable conclusion 
Under construction 
Licensor - Axens
Firefighting pump house with fire tanks as part of Pentane-Hexane Cut Isomerization Unit PGI-434 at OJSC “Gazprom neftekhim Salavat” OJSC “Salavatneftekhimremstroy” Design Documentation Detailed Design Documentation 2012 FAU “RF Glavgosexpertisa” favourable conclusion 
Under construction 
Licensor - Axens
Complex of Diesel Oil Hydrotreatment Units at 
LLC "Afipsk Refinery". Off-site facilities
LLC "Afipsk Refinery" Design Documentation 2013
Modernization of motor oil production in order to provide Euro 4 and 5 quality at Astrakhan Gas Processing Plant. Off-site facilities LLC "NIPI NG "Peton"
Ufa
Detailed Design Documentation 2014
Technical revamping of 1st phase at Orenburg Gas Processing Plant. Off-site facilities CJSC "Gazprom Invest Yug"
LLC "SRDI OG "Peton", Ufa
Design Documentation 2016
LNG production, storage and unloading complex at KS Portovaya. Off-site facilities: - Administrative and service area - Chemical storage area CJSC "Gazprom Invest"
LLC "SRDI OG "Peton", Ufa
Design Documentation Detailed Design Documentation 2016
Facility Client Development Stage Year Remark
Revamping of LI-150V Unit for MTBE production with capacity of 200,000 tpy JSC "Korimos"
Moscow
Detailed Design 1994 Commissioned in 1995 Licensor – OJSC "Yarsyntes", Yaroslavl
Section for Removing Methanol from Butane-Butylene Cut in MTBE production Unit JSC "Korimos"
Moscow
Detailed Design 1995 Commissioned in 1995
Re-planning to Compressor House, Transformer Substation and Control Room at the MTBE Unit JSC "Korimos"
Moscow
Detailed Design 1995 Commissioned in 1996
Propylene Complex Novokuibyshevsk Petrochemical Plant
Samara Region, Novokuibyshevsk
Technical and Commercial Proposal 1996
80,000 tpy Oligomerization Unit JSC "Korimos"
Moscow
Detailed Design 1996 Commissioned in 1997 Licensor – OC "VNIIOS", Novokuibyshevsk
Conversion of Propylene Hydroformylation Section producing butyl alcohol and 2-ethyl hexanol to process using rhodium catalyst OJSC "Interchimprom-Oxosyntez"
Perm
Technical and Commercial Proposal 1997
Addition of Equipment to MTBE Unit under General Explosion Safety Rules (PB 09-170-97) JSC "Korimos"
Moscow
Detailed Design 1998 Completed in 1999
Revamping of EP-60 Unit for MTBE production (Salavat, Bashkiria) JSC "Korimos"
Moscow
Detailed Design 1998
TAME Production Section. Additition of equipment to Oligomerization Unit within MTBE Unit JSC "Korimos"
Moscow
Detailed Design 1999 Commissioned in 1999 Licensor – OJSC "Yarsyntez", Yaroslavl
200,000 tpy TAME Unit JSC"Korimos"
Moscow
Detailed Design 2000 Commissioned in 2002 Licensor – OJSC "Yarsyntez", Yaroslavl
Feed-preparation Section for 200 000 tpy TAME Unit JSC "Korimos"
Moscow
Detailed Design Documentation 2002 Commissioned in 2003 Licensor – OJSC "Yarsyntez", Yaroslavl
Combined Fuel Refining Unit KTD-200/720. Section 100 - TAME unit with Feed-Preparation section JSC "Korimos"
Moscow
Process Operating Regulations 2003
Addition of equipment to Reactor Section 100 of Combined Fuel Refining Unit KTD 200/720 JSC "Korimos"
Moscow
Detailed Design 2007
Major Repair of Combined MTBE and Oligomerizate Unit at JSC "Korimos" LLC "Stroyinvest"
Moscow
Detailed Design Documentation 2007
Major Repair of Section 100 "TAME Production" of Combined Fuel Refining Unit KTD 200/720 JSC "Korimos"
Moscow
Detailed Design Documentation 2008
MTBE Unit at OJSC "Kuibyshev Refinery" OJSC "Samara-
neftekhimproekt"
Samara
Design and Detailed Design Documentation 2010 FAU “RF Glavgosexpertisa” favourable conclusion
Licensor – OJSC "Yarsyntez", Yaroslavl
Commissioned in July 2016
MTBE Unit at OJSC "Syzran Refinery" OJSC "Samara-
neftekhimproekt"
Samara
Basic Design Acceptance 2010 Licensor – Axens
MTBE Production Complex at OJSC "Syzran Refinery" OJSC "Syzran Refinery"
OC Rosneft
Detailed Design Documentation 2011

FAU "RF Glavexpertisa" favourable conclusion

Licensor – Axens
Revamping of Combined Fuel Refining Unit KDT-200/720. Section 100 - TAME Unit with Feed Section aiming to increase capacity up to 50 t/h OJSC “Gaspromneft-Mosxow Oil Refinery” Design Documentation Detailed Design Documentation 2015 Licensor – Yarsyntez Company, Yaroslavl
Revamping of MTBE Unit OJSC “Gaspromneft-Mosxow Oil Refinery” Design Documentation Detailed Design Documentation 2015 Licensor – Yarsyntez Company, Yaroslavl
Facility Client Development Stage Year Remark
Crude Oil and Condensate Complex Hydrotreating Unit of Offshore Field Groups Gasprom dobycha Krasnodar Ltd. Design and Detailed Design Documentation 2015
Facility Client Development Stage Year Remark
Deethanization Gas Treatment Unit at Urengoy Plant Condensate Preparation for Transport on a turnkey basis (EPC contract) Gasprom pererabotka Ltd.
NIPI NG Peton
Detailed Design Documentation 2015
Revamping of booster compression station at Urengoy Plant of condensate preparation for transportation in order to supply feed to Novyi Urengoy Gas and Chemical Complex on a turnkey basis (EPC contract) Gasprom pererabotka Ltd.
NIPI NG Peton
Detailed Design Documentation 2015
NGL/NRU and Helium Concentrate Production Unit, Helium Fine Purification, Liquefaction and Filling Unit (Civil Engineering) JSC "NIPIgas Pererabotka"
LLC "SRDI OG Peton", Ufa
Detailed Design Documentation 2016
LNG production, storage and unloading complex at Compressor Station Portovaya: - Instrument air section - Nitrogen recovery section - Flare system - Administrative and service area - Chemical storage area LLC "Gazprom Invest"
LLC "SRDI OG Peton", Ufa
Design Documentation Detailed Design Documentation 2016
Facility Client Development Stage Year Remark
Oil Terminal in Gatchina area JSC "LUKOIL-St. Petersburg"
St. Petersburg
Technical and Commercial Proposal 1996
Fuel Stations Network for JSC "LUKOIL-Tatarstan" CJSC "Petroil"
Tatarstan
Business Booklet 1997
Oil Terminal in Volkhov LLC "Verona Torg"
Moscow
Business Plan 2001
Tank Car Unloading Rack for Dark Oil Products at Oil Terminal in the Murmansk Sea Fishing Port Giprorybflot Approvals package of Detailed Design 2002 Financing suspended in view of change in shareholders
Dark Oil Products Pumping Station in Murmansk Sea Fishing Port Giprorybflot Detailed Design 2002
Upgrading of the tank car loading rack for dark products State-run Murmansk Fishing Port Detailed Design Documentation 2002 Financing suspended in view of change in shareholders
Bunkering depot of sea transshipment complex of Kirov plant. Engineering solutions OJSC "Lenmorniiprojeckt"
St. Petersburg
Detailed Design (Approvals package) 2003
Revamping of fuel storage No. 632 of North Fleet in settlement of Mokhnatkina Pakhta, Murmansk Region LLC "Kommandit Service"
Murmansk
Design offer 2004
Revamping of Khabarovsk petroleum storage depot of OJSC "Khabarovsk Nefteproduct" OJSC "Khabarovsk Nefteproduct"
Khabarovsk, OC Alliance
Detailed Design (Approvals package) 2005 FAU "RF Glavexpertiza" positive conclusion
Revamping of Wastewater Treatment Facilities at Khabarovsk petroleum storage depot of OJSC” Khabarovsk Nefteproduct” OJSC "Khabarovsk Nefteproduct"
Khabarovsk, OC Alliance
Detailed Design 2006
Layout of Ust-Luga bunkering complex on the planned site Fiona Trust and Holding Corporation Pre-Design Proposals 2007
The second stage of revamping of Wastewater Treatment Facilities at Khabarovsk petroleum storage depot of OJSC "Khabarovsk Nefteproduct" Khabarovsk Nefteproduct
OJSC "Khabarovsk Nefteproduct"
Khabarovsk, OC Alliance
Detailed Design Documentation 2009
Revamping of railway rack No.1 for light petroleum products unloading and construction of pump station for light petroleum products unloading on the territory of petroleum depot at OJSC "Primornefteprodukt", Vladivostok OJSC "Primornefteprodukt", Vladivostok Detailed Design Documentation 2014
Revamping of Slantsy Oil Terminal LLC "NORDWESTTERMINAL" Detailed Design Documentation 2014
Facility Client Development Stage Year Remark
Upgrading of Refrigerating Unit in Auxiliary Building JSC "Baltika Brewery"
St. Petersburg
Detailed Design Documentation 1996 Commissioned in 1996
Installation of Ventilation Equipment for Filling Line in Main Production Building JSC "Baltika Brewery"
St. Petersburg
Detailed Design Documentation 1997 Commissioned in 1997
Upgrading of Auxiliary Building. Carbon Dioxide Production JSC "Baltika Brewery"
St. Petersburg
Detailed Design Documentation 1997 Commissioned in 1998
Upgrading of Auxiliary Building. Installation of Refrigerant Tank JSC "Baltika Brewery"
St. Petersburg
Detailed Design Documentation 1997 Commissioned in 1998
Tie-In of Ammonia Refrigerating Station JSC "DEKA"
Novgorod
Detailed Design Documentation 1997 Commissioned in 1998
Upgrading of Auxiliary Building. Carbon Dioxide Production. Increase of Station Capacity JSC "Baltika Brewery"
St. Petersburg
Detailed Design Documentation 1998 Commissioned in 1999
Facility Client Development Stage Year Remark
Electric Heat Tracing of Paraffin Solvent Production Unit (Electric Desalter, Atmospheric and Vacuum Distillation Unit, Bitumen Plant) and Off-Site Facilities JSC "LUKOIL-Kogalymneftegaz"
Kogalym
Detailed Design Documentation 1995 Commissioned in 1997
Electric Heat Tracing for Bitumen Plant of "Stroydetal" Company "Viktoria" Company
St. Petersburg
Detailed Design 1997 Commissioned in 1997
Electric Heat Tracing of Equipment, Pipelines and Floors of Open-Type Pump Stations of P-24-1400/1 Diesel Oil Hydrotreating Unit at LLC "LUKOIL-Volgogradneftepererabotka" JSC "LUKOIL-Rostovneftekhimproekt"
Rostov-on-Don
Detailed Design Documentation 1997 Commissioned in 2000
Upgrading of 1A/1M Catalytic Cracking Unit. JSC "Yaroslavl Refinery". Electric Heat Tracing Raychem
The Netherlands
Detailed Design 1998 Commissioned in 1999
Electric Heat Tracing of Pipelines for Facilities of Vostochno-Pridorozhnoye and Druzhnoye Fields Oil-and-gas production department "Druzhbaneft"
Central Crude Accumulation Station Druzhnoye
Kogalym
Detailed Design 1998 Commissioned in 1999
Polycarbonate Flakes Production Facility. Electric Heat Tracing of Pipelines and Equipment. DOW Plant (Germany) Raychem
The Netherlands
Detailed Design 1998 Commissioned in 1999
Interplant Utility Lines. Electric Heat Tracing Petersburg Oil Terminal
St. Petersburg
Detailed Design 1999 Commissioned in 1999
Electric Heat Tracing of Cyclohexane Pipelines for OJSC "ERA" JSC "Promteplomontazh"
Tosno, Leningrad Region
Detailed Design 1999 Commissioned in 1999
Electric Heat Tracing of Pipelines at Norske Skog Golbey РМ2 Plant (Germany) Raychem
The Netherlands
Detailed Design 1999 Commissioned in 2000
Electric Heat Tracing of Oil Products Loading Rack Facilities for LLC "KINEF", Kirishi JSC "Lengiproneftechim"
St. Petersburg
Electrical Part of Detailed Design 2000 Commissioned in 2001
Electric Heat Tracing of Л-24/8с Unit at OJSC "Syzran Refinery" during revamping of Unit to light vacuum gas oil hydrocracking process Volgograd Company “Neftezavodmontazh”, Volgograd Detailed Design Documentation 2001 Commissioned in 2001
Electric Heat Tracing of Outside Racks at Bitumen Plant and Vacuum Gas Oil Tank Farm Nizhekamsk Refinery Detailed Design Documentation 2001 Commissioned in 2002
Electric Heat Tracing of Oil Fuel Supply and Discharge Pipelines for Phase III of Petersburg Oil Terminal Complex Expansion LLC "Elix"
St. Petersburg
Detailed Design 2002 Commissioned in 2002
Electric Heat Tracing of Hydrogen-Rich Gas Drying Section and Hydrotreating and Reforming Catalyst Regeneration Section of VR-650 Unit for LLC "Uraineftegaz" TERMON Europa GmbH
Germany
Detailed Design Documentation 2002 Commissioned in 2003
Electric Heat Tracing and Heat Insulation of Air and Instrument Air Lines at Sea Terminal in Novorossiysk CJSC "Caspian Pipeline Consortium" Detailed Design Documentation 2002 Commissioned in 2002
Electric heat tracing. Petersburg oil terminal. Extension stage IV. Railroad tank car unloading rack for light and dark petroleum products. Pumping station for petroleum product unloading. Interplant pipelines. Heat tracing LLC "Elix"
St. Petersburg
Detailed Design Documentation 2003 Commissioned in 2004
Oil fuel pipelines. Railroad Tank car unloading/loading rack Electric heat tracing CJSC "Sigma"
St. Petersburg
Detailed Design Documentation 2004 Commissioned in 2004
1 million tpy Catalytic Reforming Unit PR-22-35-11/1000 for LLC "LUKOIL-Volgogradnefterpererabotka". Electric heat tracing OJSC "LUKOIL-Rostovneftechimproekt"
Rostov-on-Don
Detailed Design Documentation 2006 Commissioned in 2006
Electric heat tracing of pipelines, impulse lines, cabinets, instrumentation, 4 open pumping stations of isomerization unit at
LLC "LUKOIL-Volgogradneftepererabotka"
LLC "TECHENERGO-SERVICE" Detailed Design Documentation 2007
Facility Client Development Stage Year Remark
Review of technical documentation for GKP 126/33 Unit, developed by Ventech company (USA) LLC "LUKIOL-Western Siberia"
Kogalym
Consultancy services during acceptance of design documentation and equipment 2000
Consultancy services on replacement of instrumentation mounting structures based on American standards for OJSC "LUKOIL-Permneftorgsyntez" Unit AVT-4 by structures of home manufacture based on Russian standards LLC "Evrotek" Consultancy services 2007
Consultancy services on application of Russian norms and regulations in design of Hydroprocessing Complex facilities at
OJSC "Khabarovsk Refinery"
Tecnicas Reunidas
Spain
Consultancy services 2008
Consultancy services on elaboration of design documentation by Customer at Straight-Run Fuel-ZPT-450 Refinery LLC "Volkhovneftechim"
Volkhov, Leningrad Region
Consultancy services 2009
Consultancy services on application of Russian norms and regulations in design of H2S Treatment Unit at OJSC "Khabarovsk Refinery" Tecnimont KT
Italy
Consultancy services 2011
Facility Client Development Stage Year Remark
Conformity of Motor Fuel Refinery design estimates prepared by TECHNIP, France, to Russian Federation norms and regulations Volkhvy Company
Volkhov, Leningrad Region
Expert Report 1997
Linde and Bateman-Glencore Proposals for High-Octane Blending Component Production Complex at Achinsk Refinery SPE "Petrotech"
St. Petersburg
Expert Report 1997
Expert report on detailed design of 30 m3 steel horizontal cylinder tank for petroleum product storage CJSC "SANTECH"
St. Petersburg
Expert Report 1998
JSC "Baltic Petroleum" Property Evaluation ВР Marine Ltd.
Great Britain
Expert Report 1998
Inspection of LLC "KomiBitum" and JSC "Crude Oil Treatment Complex Facilities" in Usinsk OJSC OC KomiTEK
Moscow
Expert Report based on inspection results 1998
Main lines of revamping heat supply sources in Leningrad Region Government of Leningrad Region Expert Report 1998
Possibility of converting unit L-35-11/1000 at Kuibyshev Refinery to isoselectoforming process SPE "Petrotech"
St. Petersburg
Expert Report 1999
Compliance of reactor RGDS 00.00.000 technical design developed by
OJSC "Volgogradneftemash" for Unit Л-24/6 at OJSC "Syzran Refinery" with norms and requirements for diesel oil hydrotreating process
OJSC "Volgogradneftemash"
Volgograd
Expert Report 1999
Expert report on detailed design "Gas Catalytic Production. Sulfur Recovery Unit. After-treatment of SRU off-gas" JSC "Ufa Refinery"
Ufa
Expert Report 2000
Industrial safety expertise for crude oil tank farm project LLC "KINEF"
Kirishi, Leningrad Region
Expert Report 2002
Industrial safety expertise of Feasibility Study (stadiya "PROEKT") of petroleum product distribution transshipment complex (LUKOIL II) OJSC "LUKOIL-Nefteproduct"
Vysotsk, Leningrad Region
Expert Report 2002
Industrial safety expertise of detailed design documentation on the first start-up complex of petroleum product distribution and transshipment OJSC "LUKOIL-Nefteproduct"
Vysotsk, Leningrad Region
Expert Report 2004
Industrial safety expertise for Units Design of Hydroprocessing Complex LLC "KINEF"
Kirishi, Leningrad Region
Expert Report 2004
Follow-up of industrial safety expertise of detailed design documentation on revamping of unit ЛЧ-24/2000 at LLC "LUKOIL-Nizhegorodnefteorgsyntez" aiming to transfer to diesel oil production with sulfur content 10 ррm LLC "LUKOIL-Nizhegorodnefteorgsyntez"
Nizhniy Novgorod
Follow-up of industrial safety expertise 2011
Facility Client Development Stage Year Remark
Provision of services on financial and technical survey during investment project implementation Vnesheconombank (State Corporation "Bank of Development and Foreign-Economic Activity")
OJSC "Khabarovsk Refinery"
Financial and technical survey 2010
Facility Client Development Stage Year Remark
Elaboration of purchasing documentation for realization of project “Deethanization Gas Treatment Unit at Urengoy Plant Condensate Preparation for Transport” on a turnkey basis (EPC contract) Gasprom pererabotka Ltd. Technical and Commercial Parts of Purchasing Documentation for Competitive Bidding for the Right to Make General Contractor Turnkey Construction Project 2015
Elaboration of purchasing documentation for realization of project “Revamping of Booster Compressor Station at Oil-and-Gas Chemical Integrated Plant” on a turnkey basis (EPC contract) Gasprom pererabotka Ltd. Technical and Commercial Parts of Purchasing Documentation for Competitive Bidding for the Right to Make General Contractor Turnkey Construction Project 2015