No. | Description | Expert Report No. |
1 | 2 | 3 |
1 | Feasibility Study (Studiya "Proekt") for Hydroprocessing Complex at OJSC "Khabarovsk Refinery",
OC "Alliance" | 27/18-07 of 17.04.2007 |
2 | Project "Revamping of Khabarovsk oily and rainy water treatment faculties at petroleum storage depot of OJSC "Khabarovsknefteproduct" | 092-08/ХГЭ-0141/02 of 22.07.2008 |
3 | Project "Wax Hydtrotreating Section of 40/3 Deoiling Unit at LLC "LUKOIL- Nizhegorodnefteorgsyntez" | 556-08/ГГЭ-5601/02 of 26.08.2008 |
4 | Approvals package of detailed design "Complex of Isomerization Unit with DHT hydrotreating
PGI-DIH/280 for OJSC "Syzran Refinery", OC "Rosneft" | 368-09/ГГЭ-6124/02 of 19.06.2009 |
5 | Approvals package of detailed design "Revamping of Catalytic Reforming Unit ЛЧ-35-11/600 for
OJSC "Syzran Refinery", OC "Rosneft" | 702-09/ГГЭ-6381/02 of 12.11.2009 |
6 | Design documentation "Motor fuel production. Unit ЛЧ-24/2000". Revamping at
OJSC "Nizhegorodnefteorgsyntez" | 760-09/ГГЭ-6411/02 of 02.12.2009 |
7 | Detailed design for "LLC "Nizhevartovsk NPO". Revamping of shop No.3 column section. Installation of reboilers" | 337-09/ГГЭ-1102/02 of 21.12.2009 |
8 | Design documentation "Complex of Isomerization Unit PGI-DIH/280-K" for OJSC "Kuibyshev Refinery", OC "Rosneft" | 227-12/ГГЭ-7833/02 of 15.03.2012 |
9 | Design documentation "Complex of Isomerization Unit PGI-DIH/280-NK" for OJSC "Novokuibyshevsk Refinery", OC "Rosneft" | 278-12/ГГЭ-7871/02 of 05.04.2012 |
10 | Design documentation "MTBE Production Complex at OJSC “Syzran Refinery”. Amenity building with distribution substation" | 0246-13/СГЭ-2961/03 of 21.06.2013 |
11 | Design documentation and results of engineering surveys for “MTBE Production Complex” at
OJSC “Syzran Refinery”, OC “Rosneft” | 697-13/ГГЭ-8649/02 of 22.08.2013 |
12 | Design documentation and results of engineering surveys for Pentane-Hexane Cut Isomerization Unit at OJSC "Gaspromneftechim Salavat” | 790-13/ГГЭ-8689/02 of 13.2009.2013 |
13 | Design documentation "Construction of Controller Units 22/4 and Benzene Cut Stabilization Units.
LLC "Afipsk Refinery" | 867-13/РГЭ-2608/03 of 29.11.2013 Rostov Branch Office |
14 | Design documentation and results of engineering surveys for "MTBE Production Complex at
OJSC "Kuibyshev Refinery", OC "Rosneft" | 1026-14/ГГЭ-9353/02 of 25.08.2014 |
15 | Design documentation and results of engineering surveys for "Revamping of Hydrotreatment Section at Catalytic Reforming Unit at JSC "NNK-Khabarovsk Oil Refinery" | 040-15/ХГЭ-1723/02 of 11.02.2015 |
16 | Design documentation and results of engineering surveys for “Revamping of combined catalytic cracking unit G-43-107” at OJSC “Gazprom-Moscow Refinery” | 1754-15/ГГЭ-10338/02 of 22.12.2015 |
17 | Design documentation and results of engineering surveys for “Revamping of unit L-35/11-1000 aimed to reduce operating pressure” at JCS “Kuibyshev Refinery” | 1750-15/ГГЭ-10308/02 of 22.12.2015 |
18 | Design documentation and results of engineering surveys for "Revamping of Diesel-Oil Hydrotreatment Unit L-24/7 at JSC "Kuibyshev Refinery" | 068-17/ГГЭ-10834/02 of 27.01.2017 |
19 | Design documentation and results of engineering surveys for "LNG Production, Storage and Unloading Complex at Compressor Station Portovaya ". Stage 3: Construction of LNG Production, Storage and Unloading Complex at Compressor Station Portovaya" | 854-17/ГГЭ-11155/02 of 15.08.2017 |
20 | Design documentation and results of engineering surveys for "Hydroisodewaxing Complex in LLC "Gazpromneft-SM" affiliate "Omsk Lubes Production Plant" | 314-18/ГГЭ-11927/02 of 22.03.2018 |
21 | Design documentation and results of engineering surveys for "LNG Production, Storage and Unloading Complex at Compressor Station Portovaya ". Stage 3: Construction of LNG Production, Storage and Unloading Complex at Compressor Station Portovaya" | No. ЕГРЗ 47-1-1-3-014893-2019 17.06.2019 |
Industrial Safety Expert Reports | ||
22 | Project " Revamping of Khabarovsk petroleum storage depot of Khabarovsk Nefteproduct Company" | 11-ПД-348-2005(НХ) of 11.10.2006 |
23 | Project "Retrofitting of reactor section of unit GDS-850" for LLC"LUKOIL-Ukhtaneftepererabotka" | 05.01.12/753 of 16.07.2012 |
24 | Project "Retrofitting of heater section of Catalytic Reforming unit LG-35-11/300-95 for LLC "LUKOIL-Ukhtaneftepererabotka" | 05.01.12/785 of 23.08.2012 |
25 | A set of documents on CDU / VDU technical upgrading at OJSC " Khabarovsk Refinery" | 71-ИД-001024-2013 of 03.04.2013 |
26 | Technical re-equipment of heat-exchange system of desalter unit ЭЛОУ-АВТ-2,5 (code 73281024-432/12-001) at Novoshakhtinsk Oil Products Plant | 29-ТП-01499-2015 of 26.01.2015 LLC "ExpertService" |